Home
Categories
EXPLORE
True Crime
Comedy
Business
Society & Culture
Sports
History
News
About Us
Contact Us
Copyright
© 2024 PodJoint
00:00 / 00:00
Sign in

or

Don't have an account?
Sign up
Forgot password
https://is1-ssl.mzstatic.com/image/thumb/Podcasts221/v4/f7/9f/dd/f79fddca-b831-c7ec-e011-45a807c1c19d/mza_1077369051072652611.jpg/600x600bb.jpg
AEMO On Air
Australian Energy Market Operator
32 episodes
2 weeks ago
Australia’s electricity system is transforming at speed and the choices made, specifically in the coming decade, will shape costs, reliability and emissions outcomes for generations. In this episode of AEMO On Air, we sat down with Nicola Falcon, AEMO’s Executive General Manager of System Design, to unpack the Draft 2026 Integrated System Plan (ISP) and the big themes shaping this story. With electricity demand forecast to nearly double by 2050, driven by electrification of homes, industr...
Show more...
Education
RSS
All content for AEMO On Air is the property of Australian Energy Market Operator and is served directly from their servers with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
Australia’s electricity system is transforming at speed and the choices made, specifically in the coming decade, will shape costs, reliability and emissions outcomes for generations. In this episode of AEMO On Air, we sat down with Nicola Falcon, AEMO’s Executive General Manager of System Design, to unpack the Draft 2026 Integrated System Plan (ISP) and the big themes shaping this story. With electricity demand forecast to nearly double by 2050, driven by electrification of homes, industr...
Show more...
Education
https://is1-ssl.mzstatic.com/image/thumb/Podcasts221/v4/f7/9f/dd/f79fddca-b831-c7ec-e011-45a807c1c19d/mza_1077369051072652611.jpg/600x600bb.jpg
Building the 2026 ISP: developing a very different Integrated System Plan in 2026
AEMO On Air
24 minutes
4 months ago
Building the 2026 ISP: developing a very different Integrated System Plan in 2026
In July we hit the half-way mark in the development of the 2026 Integrated System Plan (ISP) with the publication of a number of key reports, including the Inputs, Assumptions and Scenarios Report (IASR) and the new Gas Infrastructure Options Report (GIOR). The ISP is the strategic roadmap for Australia's National Electricity Market (NEM) and it outlines the investment and infrastructure required to meet government emissions and renewable energy targets and keep the lights on and the gas flow...
AEMO On Air
Australia’s electricity system is transforming at speed and the choices made, specifically in the coming decade, will shape costs, reliability and emissions outcomes for generations. In this episode of AEMO On Air, we sat down with Nicola Falcon, AEMO’s Executive General Manager of System Design, to unpack the Draft 2026 Integrated System Plan (ISP) and the big themes shaping this story. With electricity demand forecast to nearly double by 2050, driven by electrification of homes, industr...