We break down the toughest leap for contractors: moving from swinging a hammer to running projects with foresight, systems, and steady cash flow. We share a practical plan for calendars, crews, invoicing, and client updates that lowers stress and raises profit. • delayed gratification as the new mindset • calendar as the core tool three to six weeks out • weekly rhythm with Tuesday and Friday anchors • energy-based time blocking and audit habits • the revenue math of leaving field labor • on...
All content for Contractor Cuts is the property of ProStruct360 and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
We break down the toughest leap for contractors: moving from swinging a hammer to running projects with foresight, systems, and steady cash flow. We share a practical plan for calendars, crews, invoicing, and client updates that lowers stress and raises profit. • delayed gratification as the new mindset • calendar as the core tool three to six weeks out • weekly rhythm with Tuesday and Friday anchors • energy-based time blocking and audit habits • the revenue math of leaving field labor • on...
Part 1 - Pay Yourself Right: From Chaos Draws to a Real Owner’s Salary
Contractor Cuts
41 minutes
1 month ago
Part 1 - Pay Yourself Right: From Chaos Draws to a Real Owner’s Salary
We break down how contractors can stop mixing wages with profit, set a real project manager salary, and build cash reserves that make growth possible. A simple example shows how to allocate profit to taxes, owner distributions, and retained earnings without starving the business. • separating labor pay from company profit for solo operators • setting a fair PM salary while keeping profit in the business • targeting gross margin ranges by job size and risk • understanding revenue, gross profi...
Contractor Cuts
We break down the toughest leap for contractors: moving from swinging a hammer to running projects with foresight, systems, and steady cash flow. We share a practical plan for calendars, crews, invoicing, and client updates that lowers stress and raises profit. • delayed gratification as the new mindset • calendar as the core tool three to six weeks out • weekly rhythm with Tuesday and Friday anchors • energy-based time blocking and audit habits • the revenue math of leaving field labor • on...