Power Mining Analysis
Anthony Power & Bryce McNallie
451 episodes
1 day ago
We weigh the Nvidia beat against a falling Bitcoin price and show why data center power, not GPUs, is the true bottleneck for AI. Site visits, fresh contracts, and campus build-outs reveal how miners are pivoting into durable, contracted HPC revenue. • Bitcoin price slide and miner sentiment • Nvidia’s record results and AI infrastructure demand • Power constraints as the limiting factor for compute • Field reports from Corsicana and Childress mega-sites • Microsoft’s footprint and expansion...
Show more...
Investing
Business
RSS
All content for Power Mining Analysis is the property of Anthony Power & Bryce McNallie and is served directly from their servers with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
We weigh the Nvidia beat against a falling Bitcoin price and show why data center power, not GPUs, is the true bottleneck for AI. Site visits, fresh contracts, and campus build-outs reveal how miners are pivoting into durable, contracted HPC revenue. • Bitcoin price slide and miner sentiment • Nvidia’s record results and AI infrastructure demand • Power constraints as the limiting factor for compute • Field reports from Corsicana and Childress mega-sites • Microsoft’s footprint and expansion...
Show more...
Investing
Business
https://is1-ssl.mzstatic.com/image/thumb/Podcasts211/v4/7f/8b/19/7f8b1990-9ca8-f27d-b396-be558ccf0af8/mza_14389872449198627175.jpg/600x600bb.jpg
IREN - Childress Facility Tour & Analysis!
Power Mining Analysis
22 minutes
1 week ago
IREN - Childress Facility Tour & Analysis!
We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal. • community impact in Childress and local hiring • 750 MW campus scale with 500 MW operating • grid-connected power and 345 kV lines • substation readiness and long-lead equipment • air-cooled Bitcoin hall...
Power Mining Analysis
We weigh the Nvidia beat against a falling Bitcoin price and show why data center power, not GPUs, is the true bottleneck for AI. Site visits, fresh contracts, and campus build-outs reveal how miners are pivoting into durable, contracted HPC revenue. • Bitcoin price slide and miner sentiment • Nvidia’s record results and AI infrastructure demand • Power constraints as the limiting factor for compute • Field reports from Corsicana and Childress mega-sites • Microsoft’s footprint and expansion...