Home
Categories
EXPLORE
True Crime
Comedy
Business
Society & Culture
Sports
News
History
About Us
Contact Us
Copyright
© 2024 PodJoint
00:00 / 00:00
Sign in

or

Don't have an account?
Sign up
Forgot password
https://is1-ssl.mzstatic.com/image/thumb/Podcasts122/v4/39/af/18/39af187b-bd10-6358-509f-a8d5b24b38e5/mza_13241960280166829415.png/600x600bb.jpg
Real Time 3D in Education
Mike Washburn
11 episodes
5 months ago
The Real-Time 3D in Education podcast highlights the future of Education and what is possible through Interactive tools such as Twinmotion, Unreal Engine, and games like Fortnite Creative as students prepare for a future dominated by the need for real-time technology skills. Hosted by Mike Washburn and presented for educators, we will share the voices and ideas of leaders in the space who are having an incredible impact on how and why we need to teach students to create using industry-standard tools.
Show more...
Education
Technology,
Leisure,
Video Games
RSS
All content for Real Time 3D in Education is the property of Mike Washburn and is served directly from their servers with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The Real-Time 3D in Education podcast highlights the future of Education and what is possible through Interactive tools such as Twinmotion, Unreal Engine, and games like Fortnite Creative as students prepare for a future dominated by the need for real-time technology skills. Hosted by Mike Washburn and presented for educators, we will share the voices and ideas of leaders in the space who are having an incredible impact on how and why we need to teach students to create using industry-standard tools.
Show more...
Education
Technology,
Leisure,
Video Games
https://artwork.captivate.fm/1e79657d-d189-4c89-8717-7c7477dcb4f5/gd8Av4MKOm7VWt-osuMbIe3H.png
Critical Pathways to the Future with Allison Frenzel
Real Time 3D in Education
22 minutes 7 seconds
3 years ago
Critical Pathways to the Future with Allison Frenzel
Real Time 3D in Education
The Real-Time 3D in Education podcast highlights the future of Education and what is possible through Interactive tools such as Twinmotion, Unreal Engine, and games like Fortnite Creative as students prepare for a future dominated by the need for real-time technology skills. Hosted by Mike Washburn and presented for educators, we will share the voices and ideas of leaders in the space who are having an incredible impact on how and why we need to teach students to create using industry-standard tools.